Aggregate Storage
Aggregate storages are storages for storing raw materials/aggregates useful for the production of semi-finished products in Workers & Resources: Soviet Republic.
Background
Aggregate storage for raw materials/aggregates in industrial contexts involves consolidating bulk quantities of aggregates for efficient handling and processing. These storage facilities, often located near production sites, optimize logistics by reducing transportation costs and ensuring a steady supply of materials. Raw material aggregate storage helps streamline inventory management, minimize stockouts, and support just-in-time manufacturing processes.
Gameplay
Aggregate storages are placed by the player near mines and production sites. Each Aggregate storage can only store one kind of aggregate which has to be assigned by the player. Aggregates can be delivered to the aggregate storage by using dump trucks or by using conveyor belts.
Aggregates
The following aggregates can be stored in aggregate storage:
- Gravel
- Quarried stone
- Coal
- Coal ore
- Iron
- Iron ore
- Bauxite
- Raw bauxite
- Uranium ore
- Metal scrap
- Aluminium scrap
- Construction waste
Transportation
Aggregates can be transported in dump trucks, train hopper cars and via conveyor belts.
Storages
| Name | Cost | Lifespan | Energy | Wattage | Storage capacity | Structure | Notes | |
|---|---|---|---|---|---|---|---|---|
Small Aggregate storage |
347 Workdays, 8.8 Concrete, 6.8 Gravel, 5.4 Asphalt 19 Steel, 0.34 Mechanical components |
30 | 3.0 MWh | 50 kW | All aggregates 870t 522 Metal scrap 609 Aluminium scrap |
Access | 1x road access 3x Conveyor connection |
|
| L/U | 2 | |||||||
Large Aggregate storage |
675 Workdays, 16 Concrete, 13 Gravel, 10 Asphalt 34 Steel, 1.0 Mechanical components |
30 | 3.0 MWh | 50 kW | All aggregates 1950t 1170 Metal scrap 1365 Aluminium scrap |
Access | 1x road access 8x Conveyor connection |
|
| L/U | 2 | |||||||
Aggregate storage (Free) |
Free | All aggregates 180t 108 Metal scrap 126 Aluminium scrap |
Access | 1x road access |
||||
| L/U | 1 | |||||||
Aggregate storage |
442 Workdays, 61 Concrete, 6.9 Gravel, 5.5 Asphalt 15 Steel, 2.5 Mechanical components |
30 | 3.0 MWh | 50 kW | All aggregates 1000t 600 Metal scrap 700 Aluminium scrap |
Access | 1x road access 12x Conveyor connection |
|
| L/U | 2 | |||||||
Aggregate storage |
786 Workdays, 104 Concrete, 12 Gravel, 9.9 Asphalt 27 Steel, 1.5 Mechanical components |
30 | 3.0 MWh | 50 kW | All aggregates 2000t 1200 Metal scrap 1400 Aluminium scrap |
Access | 1x road access 16x Conveyor connection |
|
| L/U | 2 | |||||||
Aggregate storage |
1113 Workdays, 133 Concrete, 29 Gravel, 23 Asphalt 29 Steel, 1.7 Mechanical components |
30 | 3.0 MWh | 50 kW | All aggregates 2500t 1500 Metal scrap 1750 Aluminium scrap |
Access | 1x road access 16x Conveyor connection |
|
| L/U | 2 | |||||||
Aggregate storage |
1996 Workdays, 239 Concrete, 47 Gravel, 38 Asphalt 57 Steel, 3.5 Mechanical components |
30 | 3.0 MWh | 50 kW | All aggregates 5000t 3000 Metal scrap 3500 Aluminium scrap |
Access | 1x road access 20x Conveyor connection |
|
| L/U | 2 | |||||||
Conveyor belts
| Name | Cost | Lifespan | Energy | Wattage | Structure | Notes | |
|---|---|---|---|---|---|---|---|
Build conveyor connection |
Workdays, Steel, Mechanical components Usage depends on length. |
Access | 1x road access 3x Conveyor connection |
||||
| L/U | |||||||
Conveyor engine/transfer |
Workdays, Concrete, Gravel, Asphalt Steel, Mechanical components Usage depends on height. |
28 | 6.0 MWh | 99 kW | Access | 1x road access 4x Conveyor connection |
|
| L/U | |||||||
Conveyor engine/transfer |
Workdays, Concrete, Gravel, Asphalt Steel, Mechanical components Usage depends on height. |
28 | 6.0 MWh | 99 kW | Access | 1x road access 4x Conveyor connection |
|
| L/U | |||||||
Conveyor overpass |
431 Workdays, 8.6 Concrete, 6.6 Gravel, 5.3 Asphalt 11 Steel, 2.4 Mechanical components |
28 | 6.0 MWh | 99 kW | Access | 2x road access 2x Conveyor connection |
|
| L/U | |||||||
Conveyor overpass |
509 Workdays, 10 Concrete, 8.2 Gravel, 6.6 Asphalt 13 Steel, 2.8 Mechanical components |
28 | 6.0 MWh | 99 kW | Access | 2x road access 4x Conveyor connection |
|
| L/U | |||||||
Conveyor overpass |
509 Workdays, 10 Concrete, 8.2 Gravel, 6.6 Asphalt 13 Steel, 2.8 Mechanical components |
28 | 6.0 MWh | 99 kW | Access | 2x road access 4x Conveyor connection |
|
| L/U | |||||||
Aggregate loading
| Name | Cost | Lifespan | Energy | Wattage | Length | Structure | Notes | |
|---|---|---|---|---|---|---|---|---|
Truck aggregate loading |
94 Workdays, 1.5 Concrete, 1.1 Gravel, 0.92 Asphalt 6.2 Steel, 0.074 Mechanical components |
28 | 23 MWh | 385 kW | Access | 1x road access 2x Conveyor connection |
||
| L/U | 2 | |||||||
Train aggregate loading |
2343 Workdays, 258 Concrete, 39 Gravel, 31 Asphalt 75 Steel, 5.9 Mechanical components |
28 | 74 MWh | 1240 kW | 100 m | Access | 1x road access 3x Conveyor connection |
|
| L/U | 2 | |||||||
Train aggregate loading |
1143 Workdays, 124 Concrete, 13 Gravel, 10 Asphalt 40 Steel, 3.3 Mechanical components |
28 | 38 MWh | 645 kW | 32 m | Access | 1x road access 5x Conveyor connection |
|
| L/U | ||||||||
Train aggregate loading |
2824 Workdays, 310 Concrete, 36 Gravel, 29 Asphalt 97 Steel, 7.9 Mechanical components |
28 | 211 MWh | 3.5 MW | 123 m | Access | 1x road access 9x Conveyor connection |
|
| L/U | ||||||||
Train aggregate loading |
3297 Workdays, 351 Concrete, 44 Gravel, 35 Asphalt 112 Steel, 9.5 Mechanical components |
28 | 211 MWh | 3.5 MW | 123 m | Access | 1x road access 9x Conveyor connection |
|
| L/U | ||||||||
Harbor for aggregate loading |
4278 Workdays, 456 Concrete, 95 Gravel, 76 Asphalt 122 Steel, 9.8 Mechanical components |
30 | 208 MWh | 3.48 MW | 242 m | Access | 1x road access 3x Conveyor connection 2x Pipeline connection |
Station for 2 ships avaialable. |
| L/U | 3 | |||||||
Cableway aggregate loading (small) |
276 Workdays, 4.8 Concrete, 3.7 Gravel, 16 Steel 0.27 Mechanical components, 0.11 Electro components |
18 | 27 MWh | 465 kW | Access | 1x road access 1x Conveyor connection |
||
| L/U | ||||||||
Cableway aggregate loading (big) |
421 Workdays, 7.7 Concrete, 5.9 Gravel, 24 Steel 0.44 Mechanical components, 0.22 Electro components |
18 | 41 MWh | 697 kW | Access | 1x road access 2x Conveyor connection |
||
| L/U | ||||||||
Aggregate unloading
| Name | Cost | Lifespan | Energy | Wattage | Length | Structure | Notes | |
|---|---|---|---|---|---|---|---|---|
Truck aggregate unloading |
82 Workdays, 1.7 Concrete, 1.3 Gravel, 1.1 Asphalt 4.9 Steel, 0.062 Mechanical components |
28 | 6.0 MWh | 99 kW | Access | 1x road access 2x Conveyor connection |
||
| L/U | 2 | |||||||
Train aggregate unloading |
1435 Workdays, 61 Concrete, 47 Gravel, 37 Asphalt 60 Steel, 0.51 Mechanical components |
28 | 29 MWh | 499 kW | 149 m | Access | 1x road access 4x Conveyor connection |
|
| L/U | 2 | |||||||
Train aggregate unloading |
396 Workdays, 12 Concrete, 9.5 Gravel, 7.6 Asphalt 20 Steel, 0.30 Mechanical components |
28 | 3.0 MWh | 50 kW | 3 m | Access | 1x road access 3x Conveyor connection |
|
| L/U | ||||||||
Train aggregate unloading |
1649 Workdays, 78 Concrete, 60 Gravel, 48 Asphalt 60 Steel, 0.78 Mechanical components |
28 | 14 MWh | 249 kW | 130 m | Access | 1x road access 8x Conveyor connection |
|
| L/U | ||||||||
Train aggregate unloading |
2802 Workdays, 142 Concrete, 109 Gravel, 87 Asphalt 93 Steel, 1.3 Mechanical components |
28 | 27 MWh | 450 kW | 130 m | Access | 1x road access 16x Conveyor connection |
|
| L/U | ||||||||
Harbor for aggregate unloading |
3896 Workdays, 456 Concrete, 95 Gravel, 76 Asphalt 109 Steel, 7.0 Mechanical components |
30 | 88 MWh | 1473 kW | 242 m | Access | 1x road access 2x Conveyor connection 2x Pipeline connection |
Station for 2 ships avaialable. |
| L/U | 3 | |||||||
Cableway aggregate unloading (small) |
377 Workdays, 6.4 Concrete, 4.9 Gravel, 21 Steel 0.49 Mechanical components, 0.20 Electro components |
18 | 19 MWh | 322 kW | Access | 1x road access 1x Conveyor connection |
||
| L/U | ||||||||
Cableway aggregate unloading (big) |
807 Workdays, 19 Concrete, 15 Gravel, 44 Steel 0.67 Mechanical components, 0.34 Electro components |
18 | 33 MWh | 555 kW | Access | 1x road access 2x Conveyor connection |
||
| L/U | ||||||||
| Resources | |
|---|---|
| Aggregates | |
| Open storage | |
| Warehouse | |
| Liquid storage | |
| Other | |
| Utilities | |
| Dump | |


