Gravel processing plant
Content review required
This article has been deemed to require a review of it's content.
|
Background
A Gravel processing plant typically requires a combination of equipment and machinery to process raw materials into finished products that meet specific quality and size requirements. The exact equipment and machinery needed may vary depending on the specific operation and the type of sand and gravel being processed, usually:
- A primary crusher: This machine is used to break down large rocks into smaller pieces that can be processed more easily.
- Vibrating feeders: These devices are used to transport raw materials from the primary crusher to other processing equipment.
- Scalping screens: These screens remove large particles that are not needed in the final product.
- Gravel washing and classification equipment: These machines are used to wash, separate, and classify the sand and gravel by size and shape.
Gameplay
The player places a Gravel processing plant for the production of gravel anywhere on the map on equalized, solid ground. To produce gravel the player needs to deliver quarried stone to the Gravel processing plant and workers need to be available in the plant.
Production
The large Gravel processing plant can have a maximum daily production of 82t of gravel per workday, while the small Gravel processing plant has a maximum daily production of 27t of gravel per workday.
Storage
Gravel can be stored in aggregate storages.
Transportation
Gravel can be transported in dump trucks, train hopper cars and via conveyor belts.
Uses
Gravel is an aggregate that has many applications. It can be used in the creation of other resources such as asphalt, cement, concrete, prefab panels and chemicals. It can be used in almost all constructions during the groundworks phase. It can also be sold for a moderate price.
Construction
Expansion required
This article is too short to provide more than rudimentary information about the subject and/or has missing construction stages. You can help us by expanding it.
|
- Gravel processing plant
| Requirements | Groundworks | |||
|---|---|---|---|---|
1197 Workdays 109t Concrete 12t Gravel 10t Asphalt 44t Steel | 192 Workdays 16t Concrete 12t Gravel 10t Asphalt Mechanisms: Excavators (max. 3) Needs workers (max. 119) |
- Small gravel processing plant
| Requirements | Groundworks | |||
|---|---|---|---|---|
375 Workdays 2.8t Concrete 2.1t Gravel 1.7t Asphalt 12t Steel | 32 Workdays 2.8t Concrete 2.1t Gravel 1.7t Asphalt Mechanisms: Excavators (max. 3) Needs workers (max. 50) |
| Resources | |
|---|---|
| Aggregates | |
| Open storage | |
| Warehouse | |
| Liquid storage | |
| Other | |
| Utilities | |
| Dump | |