Pathfinding
Expansion required
This article is too short to provide more than rudimentary information about the subject and/or has missing construction stages. You can help us by expanding it.
|
Pathfinding in Workers & Resources: Soviet Republic
Pathfinding rules at certain times can be opaque, poorly explained or documented. Some buildings allow Pedestrians or Vehicles to pathfind through them, while others do not. Other mechanics can be at play where certain buildings have an Autobuild or Autosearch radius that can influence the pathfinding as well.
Road vehicles
Expansion required
This article is too short to provide more than rudimentary information about the subject and/or has missing construction stages. You can help us by expanding it.
|

The setup has two grain silo's apart at roughly 1km ground distance. There is a Distribution office placed hauling Crops from one silo to the other, and the to be tested building is placed in between.
Autosearch radius buildings
Autobuild radius buildings
Pedestrians
Expansion required
This article is too short to provide more than rudimentary information about the subject and/or has missing construction stages. You can help us by expanding it.
|
Paths through buildings
Switches infrastructure type
Trains
Expansion required
This article is too short to provide more than rudimentary information about the subject and/or has missing construction stages. You can help us by expanding it.
|

Paths through buildings
The way these buildings have been verified to be pathable through is twofold.
- A direct logisical connection on the train itself, station to station.
- By servicing stations with a Rail Distribution Office.
A train is used to bring Crops from one silo to another. After roughly 200meters the building to be tested gets build at both silo's. Then a stretch of rail of 3.500 meters long (ground) is placed between the buildings. Trains are then setup to path with option 1 or 2 mentioned above.
Buildings that were pathed through successfully include:





