Footpaths

From Workers & Resources: Soviet Republic Official Wiki

Background

A footpath (also pedestrian way, walking trail, nature trail) is a type of thoroughfare that is intended for use only by pedestrians and not other forms of traffic such as motorized vehicles, bicycles and horses. They can be found in a wide variety of places, from the centre of cities, to farmland, to mountain ridges.

Gameplay

In Workers & Resources: Soviet Republic footpaths are mainly used by Citizens; they are really keen on using them. Footpaths can be used to take shortcuts where the player can't put roads. Emergency vehicles such as (secret) police cars, ambulances, and fire trucks can also make use of footpaths, but they prefer roads.

Footpaths can be connected to other footpaths and to roads. It's also possible to make use of overpasses and underpasses, which are only accessible by citizens. Metro related infrastructure can be found under underpasses.

Types

There are two kinds of footpaths: mud and gravel. It's possible to upgrade mud footpaths to (gravel) footpaths.

Type Cost Walking speed Max. speed (cars) Notes

Mud
Free

Usage depends on length.

50%[1] 15 km/h

Footpath
Workdays Workdays, Gravel Gravel

Usage depends on length.

87%[1] 35 km/h

Asphalt footpath[2]
Workdays Workdays, Gravel Gravel,

Asphalt Asphalt
Usage depends on length.

95% 35 km/h

Asphalt footpath with lights[2]
Workdays Workdays, Gravel Gravel,

Asphalt Asphalt, steel steel,
Electronic components Electronic components
Usage depends on length.

100% 35 km/h

Notes

  • Citizens walk a distance of about 235 m over mud paths, about 411 m over gravel paths, about 450 m over asphalt paths, and about 479 m over asphalt paths with lighting.

Overpass

Type Cost Walking speed Notes

Pedestrian overpass steel
Workdays Workdays, Concrete 1.9t Concrete

Gravel 1.5t Gravel, Steel 2.9t Steel


Pedestrian bridge (steel)
Workdays Workdays, Concrete Concrete

Gravel Gravel, Steel Steel Usage depends on length and height.


Pedestrian overpass concrete
Workdays Workdays, Concrete 1.8t Concrete

Gravel 1.3t Gravel, Prefab panels 10t Prefab panels
Steel 1.0t Steel


Pedestrian bridge (concrete)
Workdays Workdays, Prefab panels Prefab panels

Usage depends on length and height.

Underpass

Type Cost Walking speed Notes

Pedestrian underpass
Workdays Workdays, Concrete 5.6t Concrete

Gravel 4.3t Gravel, Bricks 32t Bricks
Boards 10t Boards, Steel 4.1t Steel


Pedestrian metro entrance (stairs)
Workdays Workdays, Bricks 33t Bricks

Boards 11t Boards, Steel 4.2t Steel

[3]

Pedestrian metro entrance (escalators)
Workdays Workdays, Concrete 87t Concrete

Gravel 2.6t Gravel, Steel 19t Steel

[3]

Pedestrian tunnel
Workdays Workdays, Bricks Bricks

Concrete Concrete, Steel Steel,
Boards Boards

  1. ↑ 1.0 1.1 Walking speed updated to Workers & Resources: Soviet Republic patch 0.8.9
  2. ↑ 2.0 2.1 Available from Workers & Resources: Soviet Republic patch 0.8.9
  3. ↑ 3.0 3.1 Metro available from Workers & Resources: Soviet Republic patch 0.8.8