Sports
Content review required
This article has been deemed to require a review of it's content.
|
Background
Sport encompasses a broad spectrum of physical activities, spanning both indoor and outdoor arenas, demanding skill, strategy, and physical prowess. Indoor sports, like basketball, volleyball, and table tennis, are typically conducted within controlled environments such as gyms or arenas, providing opportunities for competition and recreation regardless of weather conditions. Conversely, outdoor sports such as soccer, tennis, and hiking unfold in natural settings, often involving interaction with the elements. These pursuits not only enhance physical fitness but also contribute to mental well-being and foster social interaction. With roots tracing back millennia, sports have evolved from simple contests to elaborate, organized events embraced by millions globally. Whether pursued casually or professionally, sports cultivate teamwork, discipline, and a profound sense of accomplishment among participants.
Gameplay
The player is responsible for maintaining the health of workers residing within the player's republic. By strategically positioning sports-related items near areas where workers unwind, the player can shape their health preferences. It's essential for the player to consider that outdoor sports activities are affected by seasonal changes. For instance, outdoor swimming requires temperatures above 15°C, whereas field sports like football, volleyball, and basketball are feasible above 5°C.
Influences
Sports-related objects provide the following effects:
- Positive effect on the citizens' health stat. Main article: Health
- Minor effect on citizens' happiness stat. Main article: Happiness
| Name | Cost | Workers | Visitors | Lifespan | Production | Consumption | Energy | Wattage | Structure | Notes | |
|---|---|---|---|---|---|---|---|---|---|---|---|
Tennis playground |
See below | 22 | 3.0 MWh | 50 kW | Access | 4x Footpath access |
Requires weather temperature above 5°C. | ||||
| L/U | |||||||||||
Football playground |
See below | 22 | 3.0 MWh | 50 kW | Access | 4x Footpath access |
Requires weather temperature above 5°C. | ||||
| L/U | |||||||||||
Outdoor swimming pool |
See below | 20 | 0.32 kg/worker Mixed waste, 0.30 kg/customer Mixed waste | 6 m3 Heat, 0.30 m3/day Water |
3.0 MWh | 50 kW | Access | 8x Footpath access |
Requires weather temperature above 15C. | ||
| L/U | |||||||||||
Basketball and volleyball court |
See below | 22 | 0.20 kg/worker Mixed waste, 0.20 kg/customer Mixed waste | 3.0 MWh | 50 kW | Access | 4x road access |
Requires weather temperature above 5°C. | |||
| L/U | |||||||||||
Basketball and volleyball court |
See below | 22 | 0.20 kg/worker Mixed waste, 0.20 kg/customer Mixed waste | 3.0 MWh | 50 kW | Access | 6x Footpath access |
Requires weather temperature above 5°C. | |||
| L/U | |||||||||||
Football playground[1] |
See below | 22 | 0.20 kg/worker Mixed waste, 0.20 kg/customer Mixed waste | 3.0 MWh | 50 kW | Access | 4x Footpath access |
Requires weather temperature above 5°C. | |||
| L/U | |||||||||||
Volleybal court[1] |
See below | 22 | 0.20 kg/worker Mixed waste, 0.20 kg/customer Mixed waste | 3.0 MWh | 50 kW | Access | 4x Footpath access |
Requires weather temperature above 5°C. | |||
| L/U | |||||||||||
Indoor pool |
See below | 20 | 0.32 kg/worker Mixed waste, 0.30 kg/customer Mixed waste | 5 m3 Heat, 0.36 m3/day Water |
3.0 MWh | 50 kW | Access | 3x Footpath access 1x road access |
|||
| L/U | |||||||||||
Sport hall[1] |
See below | 20 | 0.20 kg/worker Mixed waste, 0.20 kg/customer Mixed waste | 6 m3 Heat, 0.30 m3/day Water |
3.0 MWh | 50 kW | Access | 9x Footpath access |
|||
| L/U | |||||||||||
Sport hall[1] |
See below | 20 | 0.20 kg/worker Mixed waste, 0.20 kg/customer Mixed waste | 10 m3 Heat, 0.50 m3/day Water |
3.0 MWh | 50 kW | Access | 10x Footpath access |
|||
| L/U | |||||||||||
Notes
Construction
Expansion required
This article is too short to provide more than rudimentary information about the subject and/or has missing construction stages. You can help us by expanding it.
|
- Tennis playground
| Requirements | Groundworks | |||
|---|---|---|---|---|
71 Workdays 6.1 t Concrete 4.7 t Gravel | 71 Workdays 6.1 t Concrete 4.7 t Gravel Mechanisms: Excavator (max. 1) Needs workers (max. 50) |
- Football playground
| Requirements | Groundworks | |||
|---|---|---|---|---|
71 Workdays 6.1 t Concrete 4.7 t Gravel | 71 Workdays 6.1 t Concrete 4.7 t Gravel Mechanisms: Excavator (max. 1) Needs workers (max. 50) |
- Basketball and volleyball court
| Requirements | Groundworks | |||
|---|---|---|---|---|
53 Workdays 4.6 t Concrete 3.5 t Gravel 2.8 t Asphalt | 53 Workdays 4.6 t Concrete 3.5 t Gravel 2.8 t Asphalt Mechanisms: Excavator (max. 1) Needs workers (max. 50) |
- Basketball and volleyball court
| Requirements | Groundworks | |||
|---|---|---|---|---|
130 Workdays 11 t Concrete 8.7 t Gravel 6.9 t Asphalt | 130 Workdays 11 t Concrete 8.7 t Gravel 6.9 t Asphalt Mechanisms: Excavator (max. 2) Needs workers (max. 50) |
- Football playground[1]
| Requirements | Groundworks | |||
|---|---|---|---|---|
133 Workdays 11 t Concrete 8.8 t Gravel | 133 Workdays 11 t Concrete 8.8 t Gravel Mechanisms: Excavator (max. 1) Needs workers (max. 50) |
- Volleyball court
| Requirements | Groundworks | |||
|---|---|---|---|---|
36 Workdays 3.1 t Concrete 2.4 t Gravel 1.9 t Asphalt | 36 Workdays 3.0 t Concrete 2.4 t Gravel 1.9 t Asphalt Mechanisms: Excavator (max. 1) Needs workers (max. 50) |
- Indoor pool
| Requirements | Groundworks | |||
|---|---|---|---|---|
718 Workdays 31 t Concrete 14 t Gravel 11 t Asphalt 8.5 t Steel 37 t Bricks 12 t Boards | 211 Workdays 18 t Concrete 14 t Gravel 11 t Asphalt Mechanisms: Excavator (max. 1) Needs workers (max. 71) |
- Sport hall[1]
| Requirements | Groundworks | |||
|---|---|---|---|---|
1921 Workdays 130 t Concrete 45 t Gravel 36 t Asphalt 25 t Steel 77 t Bricks 25 t Boards | 688 Workdays 59 t Concrete 45 t Gravel 36 t Asphalt Mechanisms: Excavator (max. 2) Needs workers (max. 191) |
- Sport hall[1]
| Requirements | Groundworks | |||
|---|---|---|---|---|
3859 Workdays 119 Concrete 91 t Gravel 73 t Asphalt 43 t Steel 120 t Bricks 87 t Boards | 1380 Workdays 119 t Concrete 73 t Asphalt Mechanisms: Excavator (max. 5) Needs workers (max. 358) |
- Outdoor swimming pool
| Requirements | Groundworks | |||
|---|---|---|---|---|
520 Workdays 53 Concrete 25 t Gravel 20 t Asphalt 5.0 t Steel 3.6 t Bricks 1.2 t Boards | 386 Workdays 33 t Concrete 20 t Asphalt Mechanisms: Excavator (max. 2) Needs workers (max. 51) |
References
| Resources | |
|---|---|
| Aggregates | |
| Open storage | |
| Warehouse | |
| Liquid storage | |
| Other | |
| Utilities | |
| Dump | |


