Rail Segment: Difference between revisions
From Whiskerwood Official Wiki
No edit summary |
RabidRebel10 (talk | contribs) No edit summary |
||
| Line 28: | Line 28: | ||
|} | |} | ||
Track pieces are used to connect between your railway stations. | Track pieces are used to connect between your railway stations. | ||
Track pieces for the same railway network must be placed on the same vertical plane. They can 90 degrees on a single tile but cannot create intersections or change elevation. | |||
Careful planning is required when placing track pieces. When building across water, the log support columns may be more expensive than the iron bars and wooden planks required to build the track. Similarly, digging tunnels or terraforming pathways may take considerable time and resources. | |||
<br style="clear:both;" /> | <br style="clear:both;" /> | ||
Revision as of 06:30, 12 January 2026
Track Piece
| Track Piece | |||||
| Research | |||||
|---|---|---|---|---|---|
| Passenger Rail | |||||
| Construction Material | |||||
| 1 | 1 | ||||
| Travel Speed | |||||
| Extreme Travel Speed. | |||||
| Foot Print | |||||
| Advanced rapid Whisker transport. | 1x1 | ||||
Track pieces are used to connect between your railway stations.
Track pieces for the same railway network must be placed on the same vertical plane. They can 90 degrees on a single tile but cannot create intersections or change elevation.
Careful planning is required when placing track pieces. When building across water, the log support columns may be more expensive than the iron bars and wooden planks required to build the track. Similarly, digging tunnels or terraforming pathways may take considerable time and resources.


