Rail Segment: Difference between revisions

From Whiskerwood Official Wiki
m Typo fix
CaithLoki (talk | contribs)
No edit summary
 
Line 29: Line 29:
Track pieces are used to connect between your railway stations.  
Track pieces are used to connect between your railway stations.  


Track pieces for the same railway network must be placed on the same vertical plane. They can turn 90 degrees on a single tile but cannot create intersections or change elevation.  
Track pieces for the same railway network can be on different levels. They can turn 90 degrees on a single tile but cannot create intersections but to change elevation you need to drag outward 2 tiles then use the height change keys.  


Careful planning is required when placing track pieces.  When building across water, the log support columns may be more expensive than the iron bars and wooden planks required to build the track. Similarly,  digging tunnels or terraforming pathways may take considerable time and resources.  
Careful planning is required when placing track pieces.  When building across water, the log support columns may be more expensive than the iron bars and wooden planks required to build the track. Similarly,  digging tunnels or terraforming pathways may take considerable time and resources.  
<br style="clear:both;" />
<br style="clear:both;" />

Latest revision as of 16:21, 12 January 2026

Track Piece

Track Piece
Research
Passenger Rail
Construction Material
Planks 1 Iron Bars 1
Travel Speed
Extreme Travel Speed.
Foot Print
Advanced rapid Whisker transport. 1x1

Track pieces are used to connect between your railway stations.

Track pieces for the same railway network can be on different levels. They can turn 90 degrees on a single tile but cannot create intersections but to change elevation you need to drag outward 2 tiles then use the height change keys.

Careful planning is required when placing track pieces. When building across water, the log support columns may be more expensive than the iron bars and wooden planks required to build the track. Similarly, digging tunnels or terraforming pathways may take considerable time and resources.